Construction dust is not dirt and it does not come off like dirt. It takes three passes, in an order, and anybody who tells you otherwise has not done it.
Who this is for
Homeowners and contractors at the end of a job, before the furniture comes back.
Fine dust from cutting, sanding and drilling gets into the air and then settles for days. Clean the floor first and you will clean it again tomorrow, and the day after. So the order is the whole method: high surfaces and fixtures first, then the middle of the room, then the floor, then leave it, then come back and do the floor again.
This is the longest service on the rate card by some distance, and it is the one where the estimate is most likely to move after we have seen it, because the difference between a bathroom refit and a gut renovation is not a number of bedrooms. We will say so before the visit rather than after it.
What is different
What this service reaches
What this reaches
- High surfaces, fixtures and fittings first
- Paint flecks and adhesive residue off glass and tile
- Inside every new cupboard and drawer
- Filters, grilles and vents where dust has been drawn in
- Floors last, twice, with the settling day in between
What it does not
- Remove building waste, offcuts or packaging
- Touch anything the contractor has not finished
- Clean while trades are still working — it is the last job, not a parallel one
The pricing argument
The same rate, applied for longer
Not a higher hourly rate — the same $58, for the hours this service actually takes.
Where the figures come from. Every figure on this site comes out of one rate — $58 for one cleaner for one hour — applied to the hours a job takes. There is no different hourly rate for a deep clean, a move-out or a Saturday. A longer job costs more because it is longer.
| Service | Factor |
|---|---|
| Standard clean | 100% |
| Deep clean | 160% |
| Move-out & move-in | 175% |
| Post-renovation | 200% |
| Turnover | 115% |
See a real number for your home